The 46.2MW project, costing over VND1.6 trillion (US$69.5 million), comprises 11 turbines supplied by Germany’s Enercon company with an annual output of 136,281 MWh.
Connecting with the national grid, the project also has a transformer station with a 50 MVA transformer designed and manufactured by Germany’s SIEMENS.
Trungnam Group is carrying out a number of power projects in Dak Lak, Gia Lai, Tra Vinh and Ninh Thuan, which are expected to supply 10GW of electricity in total to the national grid when completed.