Infographic: Ha Noi constructs Tu Lien Bridge over Red River
The Tu Lien Bridge, which spans 5.15 kilometres over the Red River, has a total cost of 19.83 trillion VND (765 million USD) and is scheduled for completion in 2027.
The tokenisation of real-world assets could become a new means of capital mobilisation, helping to realise the objective of achieving double-digit economic growth in line with Politburo Resolution No. 57-NQ/TW. A key prerequisite is a market infrastructure that ensures legal certainty, transparency, and verifiability.