Infographic: Ha Noi constructs Tu Lien Bridge over Red River
The Tu Lien Bridge, which spans 5.15 kilometres over the Red River, has a total cost of 19.83 trillion VND (765 million USD) and is scheduled for completion in 2027.
The Government of Viet Nam and the Asian Development Bank (ADB) on September 3 signed a 42.76 million USD financing package for a project to modernise irrigation systems and strengthen farmers’ resilience to changing climate conditions and rising pressure on water resources in Dong Nai, Gia Lai, and Quang Ngai provinces.