The project has an estimated budget of over 99 billion VND (3.88 million USD) funded by Tay Ho district People’s Committee.
The two-phase project, which is planned to be implemented from 2025 to 2027, aims to develop a wastewater collection system and pumping stations to connect to the existing West Lake wastewater collection network.
This initiative will lay the groundwork for a fully separate wastewater drainage system for the lake's surrounding area.
Beyond improving the area's drainage capacity, the project is expected to address wastewater pollution flowing into West Lake, improving the local environment.
NDO