Trains on Nhon-Hanoi Station metro line qualified to operate

Ten trains of the Nhon-Hanoi Station urban railway line were certified by the Vietnam Register on May 5 as meeting the quality, technical safety, and environmental protection standards set for railway transportation.
All 10 trains on the Nhon - Hanoi Station metro line have been labelled with inspection stamps. (Photo: MRB)
All 10 trains on the Nhon - Hanoi Station metro line have been labelled with inspection stamps. (Photo: MRB)

The certification is an important event, ensuring that trains are qualified for operation on the metro line.

The elevated section from Nhon to Cau Giay is scheduled to be put into commercial operation in July 2024.

The certification process was strictly implemented by competent authorities, based on the Railway Law and Circular No. 29/2018/TT-BGTVT on quality inspection, technical safety, and environmental protection of railway means of transportation.

Currently, all 10 trains on the Nhon - Hanoi Station metro line have been labelled with inspection stamps.

Urban railway project No. 3 of the Nhon - Hanoi Station line uses 10 trains which have been specifically designed by French manufacturer Alstom. Each train has four carriages capable of transporting 944-1,124 passengers at a speed of about 35km per hour.

NDO